Skip to content

The process

How we work

From the first call to the month after handover: what we do, what you do, and what you hold at each point.

Seven stages

One engagement, from first call to monthly review

You can stop after any stage and keep what you have. Choose a stage to see what happens, what we need from you, and what you leave with.

How long each stage takes

  1. Stage 1: A first call, 20 or 50 minutes
  2. Stage 2: The audit, Two to three weeks
  3. Stage 3: Scope, Week 1 of a build
  4. Stage 4: Design and limits, Week 1 of a build
  5. Stage 5: Build and prove, Weeks 2–7
  6. Stage 6: Launch and handover, Week 8
  7. Stage 7: Run and improve, Monthly

A first call 20 or 50 minutes The audit Two to three weeks Scope Week 1 of a build Design and limits Week 1 of a build Build and prove Weeks 2–7 Launch and handover Week 8 Run and improve Monthly

  1. Stage 1: A first call

    Typical length: 20 or 50 minutes

    Free. You tell us what is slow and why it matters now. We ask before we record or take notes with AI. We will not quote a price on this call, because a guess today becomes your expectation tomorrow.

    What you do
    Bring the process that prompted this, and one or two real examples if you can.
    What you leave with
    Whether this is worth an audit, and who else should be in the room.
  2. Stage 2: The audit

    Typical length: Two to three weeks

    We sit with the people who do the work and follow real cases from the first trigger to the last handoff. What you asked for and what is causing the pain are often different things, so we check. Everything gets sorted: build first, build later (and what has to be true first), and leave alone.

    What you do
    Give us time with the people who do the work, and three to five real cases, including ones that went wrong.
    What you leave with
    The findings document, yours to take anywhere. If you go on to a build, the audit fee is credited toward it.
  3. Stage 3: Scope

    Typical length: Week 1 of a build

    One opportunity, turned into a piece of work with edges. We agree the number it should move, from what to what, by when, and how we will both know. We write down what is out before what is in. The fee is fixed and comes from what the problem costs you today, with the arithmetic on the page.

    What you do
    Agree the number, read the out-of-scope list, and name who will check each milestone.
    What you leave with
    A statement of work you can read in ten minutes.
  4. Stage 4: Design and limits

    Typical length: Week 1 of a build

    Before anything is built we decide what the system may do alone, what needs a person to approve, and what it can never touch. Those limits are enforced by permissions, not by asking the model nicely. One named person answers for it.

    What you do
    Name the person who answers for it, and tell us which cases must always reach a person.
    What you leave with
    A one-page limits sheet.
  5. Stage 5: Build and prove

    Typical length: Weeks 2–7

    Built in milestones. Each is a finished function with a pass-or-fail check you can run without us. We test against your real cases, including the ones that went wrong, and you can read the runs. New ideas go on your Improvement Plan; they do not quietly join the build.

    What you do
    Run each check and sign off each milestone.
    What you leave with
    A working system, proven on your own cases.
  6. Stage 6: Launch and handover

    Typical length: Week 8

    Before launch you approve a monthly running-cost ceiling. We watch your team use it on real work and change what gets in their way. Then code, prompts, configuration and documentation are yours.

    What you do
    Approve the running-cost ceiling, and give your team time to use it on real work.
    What you leave with
    Everything it is made of. You should be able to fire us and keep everything working.
  7. Stage 7: Run and improve

    Typical length: Monthly

    Each month: what it cost, how many times it ran, what it delivered, and one decision: grow it, leave it, fix it, or switch it off. The Improvement Plan becomes the menu for what comes next, each item scoped and priced on its own.

    What you do
    Read the monthly review and make the call with us.
    What you leave with
    A recorded decision every month, and a menu for what comes next.

Stage 2, the audit

The work as it is actually done

An illustrative example: a fictional 40-person network and cabling installer. Follow one service request from the inbox to a quote, then see the same week from the customer’s side, where the waiting cost Saltwick the job.

Illustrative example Saltwick Cabling & Networks, a fictional 40-person network and cabling installer in British Columbia

Today Three waits and three re-keyings, and only two people who can price a job.

Scroll sideways to follow it, or read it as a list below.

Customer Office The two who price The system Emails, phones or leaves a voicemail Copies it into the job sheet Wait: about a day re-keyed Calls back for missing details Wait: two days Prices it from memory and old quotes Wait: until one is free Types the quote into accounting re-keyed Accepts, if no one else answered first Books the crew in the schedule re-keyed
After the build A reply in minutes and a quote the next day, and a person still approves every quote, question and booking.

Scroll sideways to follow it, or read it as a list below.

Customer Office The two who price The system Emails, fills in the form or leaves a voicemail Sends the approved first reply Within minutes Drafts the job record and the questions it is missing Checks the questions and sends them Same morning approves Prices it from the written pricing rules Within minutes Approves the quote, or books a site visit approves Accepts by email Confirms the crew slot the system proposed approves
Read the process as a list

Today

  1. Customer: Emails, phones or leaves a voicemail.
  2. Office: Copies it into the job sheet. Typed in again. Wait: about a day.
  3. Office: Calls back for missing details. Wait: two days.
  4. The two who price: Prices it from memory and old quotes. Wait: until one is free.
  5. Office: Types the quote into accounting. Typed in again.
  6. Customer: Accepts, if no one else answered first.
  7. Office: Books the crew in the schedule. Typed in again.

Three waits and three re-keyings, and only two people who can price a job.

After the build

  1. Customer: Emails, fills in the form or leaves a voicemail.
  2. The system: Sends the approved first reply. Within minutes.
  3. The system: Drafts the job record and the questions it is missing.
  4. Office: Checks the questions and sends them. Same morning. A person approves.
  5. The system: Prices it from the written pricing rules. Within minutes.
  6. The two who price: Approves the quote, or books a site visit. A person approves.
  7. Customer: Accepts by email.
  8. Office: Confirms the crew slot the system proposed. A person approves.

A reply in minutes and a quote the next day, and a person still approves every quote, question and booking.

The same week, from the customer's side

Today

  1. Day 1

    Sends the request. Hears nothing back.

  2. Day 2

    Still nothing. Asks a second installer too.

  3. Day 2, later that morning

    The other installer replies with two questions and a time to talk.

  4. Day 3

    Saltwick calls back for the missing details.

  5. Day 4

    The other installer sends a quote. The customer accepts it.

  6. Day 6

    Saltwick’s quote arrives. The job has already gone.

After the build

  1. Day 1, 9:10

    Sends the request.

  2. Day 1, 9:12

    Gets a reply: the request is in, here is its reference, and here is what happens next.

  3. Day 1, 10:30

    Gets the two questions still open, checked by the office before they went.

  4. Day 1, afternoon

    Answers them.

  5. Day 2

    Gets the quote, approved by the lead technician. Accepts it.

Commercial customers often ask two or three installers at once. In this example the work went to whoever answered usefully first, and Saltwick’s price never came into it.

Stage 2, the audit

Build first, later, or leave alone

Every opportunity the audit finds lands in one of three columns, with its reason written down. Choose a card to read it.

Illustrative example Saltwick Cabling & Networks, a fictional 40-person network and cabling installer in British Columbia

Build first

  • Customers ask more than one installer and go with whoever answers first. A fixed, pre-approved reply needs no one to write it.

  • Arrives every day, follows clear rules, and a person still checks every one.

  • Only the owner and the lead technician can price a job, so every quote waits for one of them, and two quotes for the same job can differ.

Build later

  • First: the schedule has to live in one system, not a whiteboard and a spreadsheet.

  • First: quotes need a recorded status, which the first build creates.

Leave alone

  • Rare, full of judgment, and the relationship with the customer is the point. A person books the site visit and prices it there.

  • A missed outage call costs more than the hours this would save. Outages go straight to the on-call technician.

Read the board as a list

Build first

  • Answer every request within minutes. Customers ask more than one installer and go with whoever answers first. A fixed, pre-approved reply needs no one to write it.
  • Turn requests into draft job records. Arrives every day, follows clear rules, and a person still checks every one.
  • Write the pricing down and quote from it. Only the owner and the lead technician can price a job, so every quote waits for one of them, and two quotes for the same job can differ.

Build later

  • Propose crew and time slots. First: the schedule has to live in one system, not a whiteboard and a spreadsheet.
  • Follow up on unanswered quotes. First: quotes need a recorded status, which the first build creates.

Leave alone

  • Pricing large office moves. Rare, full of judgment, and the relationship with the customer is the point. A person books the site visit and prices it there.
  • The after-hours outage line. A missed outage call costs more than the hours this would save. Outages go straight to the on-call technician.

Before any fee

What is the problem costing you?

The audit starts from this arithmetic. Put in your own numbers; nothing is sent anywhere.

What it costs you in a year

$28,800

5 hours × 3 people × $40 an hour × 48 working weeks

No fee and no ratio here: only what the problem costs today. Nothing you type is stored.

Stage 3, scope

A scope you can read in ten minutes

The number comes first, then what is out, then what is in. The payments follow milestones you have checked.

Illustrative example Saltwick Cabling & Networks, a fictional 40-person network and cabling installer in British Columbia

Statement of work · sample

From a service request to a quote or a booked site visit

Saltwick Cabling & Networks

The number

Time from a request arriving to a quote or a booked site visit

From
6 working days
To
1 working day or less
By
The end of the third month after launch

Proven how: Median over four weeks, measured from the inbox and accounting records, before work starts and again after.

Also tracked, but not the target: the share of quotes accepted, and how far two quotes for the same kind of job differ. Price, season and luck move these too.

Out of scope (written first)

  • Requests taken live by phone: a person still answers
  • Pricing jobs that need a site visit: a person books the visit instead
  • Changes to the pricing rules
  • Invoicing and payments
  • The after-hours outage line

In scope

  • Requests from the service inbox, the web form and voicemail
  • A fixed first reply, sent within minutes
  • A draft job record in the scheduling system
  • The pricing rules, written down with the owner and the lead technician from their past quotes
  • A quoting system that drafts every quote from those rules
  • A review screen for the office and the two who price
  • A record of every run

Pass or fail checks

  1. 1. On 50 test requests, the first reply goes out within five minutes and never holds a price, a date or a promise.
  2. 2. On 40 past requests, every required field is filled in or flagged as missing, and none is made up.
  3. 3. On 30 past jobs, the drafted quote comes within 5% of what the owner or the lead technician quoted, and anything the rules do not cover is flagged rather than priced.
  4. 4. An attempt to send anything else to a customer without a person's approval is refused and logged.

Payments at milestones you have checked

PaymentAmount
On signing amount not shown
Milestone 1: first replies and job records, checked amount not shown
Milestone 2: pricing rules written down and signed off by the owner amount not shown
Milestone 3: quotes drafted and checked amount not shown
Milestone 4: launch and handover amount not shown

The split depends on the size and type of build. Answers for the system: operations manager.

Stage 4, design and limits

What it may do, and what it may never touch

Three bands, decided before anything is built and enforced in permissions. One person answers for it.

Illustrative example Saltwick Cabling & Networks, a fictional 40-person network and cabling installer in British Columbia

DOES ALONE NEEDS A PERSON CAN NEVER REACH System

Answers for it: Operations manager

Does alone

  • Sends the fixed first reply, approved once by the operations manager, with no price, date or promise in it
  • Reads new requests from the service inbox, the web form and voicemail
  • Drafts the job record and lists what is missing
  • Drafts a quote from the written pricing rules

Needs a person

  • Every other message to a customer
  • Every quote, approved by the owner or the lead technician
  • Deciding which jobs need a site visit
  • Booking a crew
  • Outages, sent straight to the on-call technician

Can never reach

  • The pricing rules themselves: only the owner changes them
  • Payment details and the bank feed
  • Invoices already issued
  • Staff and payroll records

Enforced in permissions: the system's accounts simply cannot reach what is in the outer ring, whatever it is asked. The operations manager is the one person who answers for what it does.

Stage 7, run and improve

Every month, one decision

What it cost against the ceiling you approved, what it delivered, and what we decided to do about it.

Sample data Saltwick Cabling & Networks, a fictional 40-person network and cabling installer in British Columbia

Monthly running cost, CAD Approved ceiling $55 a month Alert at $40
Quotes accepted 25% before launch, 35% by month 6. Context, not the target.
The month before launch and six sample months after it: cost, runs, results, cost per result, quotes accepted and the decision taken. A result is one of the requests quoted or booked for a visit within one working day.
Month Cost Runs Results Per result Quotes accepted Decision
Before launch no running cost yet no runs yet 35 not applicable 25% Baseline Measured from the inbox and accounting records before work started.
Month 1 $42 (past the alert) 410 290 $0.14 27% Leave it Over the alert, as expected: extra test runs while the team checked every draft.
Month 2 $35 450 340 $0.10 30% Leave it Testing finished. Settling in.
Month 3 $44 (past the alert) 470 350 $0.13 31% Fix it Over the alert as requests grew. A code review moved two steps into plain code, and a newer, cheaper model passed the same checks.
Month 4 $27 480 372 $0.07 33% Leave it Both fixes in. Well under the alert.
Month 5 $28 520 410 $0.07 34% Grow it Follow-ups on unanswered quotes added, the next card on the board.
Month 6 $25 610 480 $0.05 35% Leave it More runs, lower cost per result.

A result is one of the requests quoted or booked for a visit within one working day. Every month ends in one decision: grow it, leave it, fix it, or switch it off. A month past the alert gets a look before it can reach the ceiling.

Quotes accepted is shown for context and is never the target: price, season and luck move it too.

The running cost stays small because most of the system is ordinary code: the first reply is a fixed message and the pricing is written rules. A model is called only to read what a request says.

At handover

What you hold at the end

Everything a system is made of belongs to you, whether or not we keep running it.

The code

In your accounts, on your infrastructure or a host you choose.

The prompts

Every instruction the system is given, versioned alongside the code.

The configuration and limits

What it may do alone, what needs a person, and what it can never touch.

The documentation

Written for the person who has to run and change it, not for us.

The test cases and run records

Your real cases, the results, and a record of every run since launch.

The Improvement Plan

Every idea raised along the way, written down and ready to scope.

Previews are illustrative, from the fictional Saltwick Cabling & Networks example.

Questions about the process

Good: write it down. New ideas go on your Improvement Plan rather than quietly joining the build, because a build that keeps growing never finishes. Once the current work is live, the plan becomes the menu for what comes next, and each item is scoped and priced on its own.

If something genuinely has to change in the current build, it goes through a written change order you approve first.

Before launch you approve a monthly running-cost ceiling for model usage and hosting. The figure depends on volume and on the model, so we work it out from your real cases during the build rather than guessing on the first call.

After launch, each monthly review shows what it actually cost, how many times it ran, what it delivered and the cost per result, set against that ceiling. An alert sits below the ceiling, and a month that passes it ends in a decision about what to fix, not in a quiet overspend.

One named person on your side answers for what the system does, agreed before anything is built, and we answer for building it to the limits you agreed. Those limits are enforced in its permissions: what it may do alone, what needs a person to approve, and what it can never touch.

Every run is recorded from day one, so when something goes wrong you can see what it was given and what it did, and the fix is tested against that case before it goes back live.

That is part of the work, not an afterthought. The people who do the job are in the audit from the first week, so the build fits how they actually work. After launch we watch your team use it on real work and change what gets in their way.

Usage is part of every monthly review. A system nobody uses returns nothing, and switching it off is a legitimate decision.

No, and on purpose. A guess on the first call becomes your expectation the next day, and nobody knows yet what the problem costs you or what a fix involves.

The first call tells us whether an audit is worth doing. The audit shows what the problem costs today and, when a build is worth it, ends with a fixed price for the first one.

Stage 1

Start with a free first call

Tell us what is slow and why it matters now. We will tell you whether an audit is worth doing, including when the honest answer is not yet.